﻿1
00:00:00,000 --> 00:00:04,170
CherryLOCK®  riveters have a setting control on the rear of the head assembly

2
00:00:04,170 --> 00:00:08,170
that is used to determine how flush rivet stems will break.

3
00:00:08,170 --> 00:00:13,210
Adjustments to this setting are required to install longer grip fasteners.

4
00:00:13,210 --> 00:00:18,130
The 680A159 gage is used to adjust the shift point setting

5
00:00:18,130 --> 00:00:21,070
and is included with the tool.

6
00:00:21,070 --> 00:00:24,290
Fasteners are categorized into groups A, B and C

7
00:00:24,290 --> 00:00:27,100
-determined by grip length.

8
00:00:27,100 --> 00:00:32,110
All Cherry double action riveters are capable of installing group A fasteners,

9
00:00:32,110 --> 00:00:42,000
but the G689 and G686B-S are the only riveters able to install B and C group fasteners.

10
00:00:42,000 --> 00:00:43,010
To adjust the setting,

11
00:00:43,010 --> 00:00:45,120
connect the tool to an air source.

12
00:00:45,120 --> 00:00:48,100
Remove the collet assembly and the pulling head.

13
00:00:48,100 --> 00:00:53,260
Then thread the smaller end of the shift setting gage into the head piston until snug.

14
00:00:53,260 --> 00:00:57,210
Press and hold the trigger so the gage is pulled into the tool head,

15
00:00:57,210 --> 00:01:02,160
and use the setting gage to identify the group for which the tool is set.

16
00:01:02,160 --> 00:01:04,090
If installing Group A rivets,

17
00:01:04,090 --> 00:01:12,250
Gage point A on the setting gage should be flush with the front of the tool head.

18
00:01:12,250 --> 00:01:18,030
Release the trigger and turn the adjuster knob clockwise to increase gage protrusion

19
00:01:18,030 --> 00:01:21,280
or counterclockwise to decrease gage protrusion.

20
00:01:21,280 --> 00:01:28,120
Cycle the tool after each adjustment and check the gage point until it lines up flush with the tool head.

21
00:01:28,120 --> 00:01:30,010
To install group B rivets,

22
00:01:30,010 --> 00:01:32,270
remove the limit pin and the adjuster ring.

23
00:01:32,270 --> 00:01:37,040
Then turn the adjuster knob six times counterclockwise.

24
00:01:37,040 --> 00:01:42,240
Replace the adjuster ring, making sure to align the friction spring with the adjuster knob.

25
00:01:42,240 --> 00:01:47,010
Turn the adjuster ring until the limit pin hole aligns with the rear cap hole,

26
00:01:47,010 --> 00:01:49,250
opposite of where the adjuster knob points.

27
00:01:49,250 --> 00:01:52,090
Then replace the limit pin.

28
00:01:52,090 --> 00:01:53,210
When adjusted correctly,

29
00:01:53,210 --> 00:01:57,120
point B of the setting gage will be flush with the front of the tool head

30
00:01:57,120 --> 00:01:59,240
while holding the trigger.

31
00:01:59,240 --> 00:02:01,160
When installing group C rivets,

32
00:02:01,160 --> 00:02:06,250
remove the limit pin and turn the adjuster knob twelve times counterclockwise from setting A,

33
00:02:06,250 --> 00:02:09,090
or six times from setting B.

34
00:02:09,090 --> 00:02:10,240
When adjusted correctly,

35
00:02:10,240 --> 00:02:15,080
gage point C will be flush with the front of the tool as the trigger is held.

